http://million-base.com/wp-content/uploads/2015/05/Tai-Guan-Banner-1.jpg http://million-base.com/wp-content/uploads/2015/05/banner.jpg http://million-base.com/wp-content/uploads/2015/05/Tai-Guan-Banner-3.jpg
Steel Work
Specialized in manufacturing and fabricating tunnel formworks, steel structure products, gantry cranes.
01
http://million-base.com/wp-content/uploads/2015/05/steel.jpg
WELL
RECOGNIZED
Certified by “General Administration of Quality Supervision, Inspection and Quarantine” (AQSIQ), and achieved ISO 9000 quality management system.
02
http://million-base.com/wp-content/uploads/2015/05/s2.jpg
GEOGRAPHICAL
ADVANTAGE
Located at Dong Guan City, convenience in travel and inspecting
03
http://million-base.com/wp-content/uploads/2015/05/s3.jpg
UNDERSTAND
HONG KONG REQUIREMENT
Experienced in providing formwork for Hong Kong Tunnel Project
DETAILED INFORMATION - 01
back to top ^
http://million-base.com/wp-content/uploads/2015/05/steel.jpg
WELL
RECOGNIZED

The structure factory we are representing has certified by “General Administration of Quality Supervision, Inspection and Quarantine” (AQSIQ), and achieved ISO 9000 quality management system. 

Management team continuously absorb Taiwan and S.Korea’s innovative skill, and introduced new equipment such as cutting machine, ultrasonic flaw detector to ensure product quality is trustworthy.  Our fabrication workshop has an area of 30,000 square meters, with several heavy duty gantry cranes, which can pre-assemble steel structure, in order to save assemble time in job site.

DETAILED INFORMATION - 02
back to top ^
http://million-base.com/wp-content/uploads/2015/05/21.jpg
GEOGRAPHICAL
ADVANTAGE

Steel structure factory is location at Dongguan city, Guangdong province

It only takes 2 hours from HungHam to factory by train. This is very important to customer benefit as we can perform frequent regular checking, making sure every stage also suits the requirement. If customer need to perform checking in person. It can also be immediately arranged, with travel to and back in one day.

DETAILED INFORMATION - 03
back to top ^
http://million-base.com/wp-content/uploads/2015/03/31.jpg
UNDERSTAND
HONG KONG REQUIREMENT

Since 2000, Steel structure factory’s professional management team has provided steel structure to Hong Kong Disneyland construction project

they understand Hong Kong project’s quality and safety requirement, also they can provide processional knowledge, to deliver better solution to customer.

Their 200 highly-skilled workers are able to perfectly build customer’s drawings into a solid steel reality.  

Million Base will also frequently communicate with both parties, ensure to bring safe, high-quality, satisfactory steel fabrication product to customer’s hand.